So, I have finally reached the end of my month at the Missouri Butterfly House. It is a bittersweet sendoff into summer. I have very much enjoyed my time working in guest services, and I believe I have become a better person because of it. Additionally, I have learned many things in my time here, such as:
- There are four types of tourists:
1. Those who genuinely want to learn more about the exhibit you are showing
2. Children of any of the other three archetypes, who are typically interested in what you have to say-- assuming you speak to them in a way they can relate to
3. Those who are just here to see the sights. These people look at the exhibits like they're rides at an amusement park.
4. Photographers. This is a rather common type of guest, but they stand out in that many of them are return visitors, some visiting multiple times a week.
In learning these patterns, I have also learned how to alter the way I interact with customers to better suit what they want to learn about. For instance: the interested guests like hearing various facts about the exhibits (e.g. We have ~2000 butterflies in the conservatory) and children like to hear about the various special characteristics and colors of butterflies.
This work has left me with a feeling of fulfillment and pride. I am glad that I completed my project, and am looking forward to complete more similar projects. In fact, I have renewed my volunteer status at the Butterfly House for the coming summer. I eagerly await this undertaking and the coming experience, service, and happiness that will accompany it.
To add the some of the rest of the notes I have taken along the way:
- Tuesdays & Sundays are by far the best. Easier crowds and good rotational schedules.
- Co-workers are great. Everyone is very interesting to talk with.
- On slow days (tues/wed/thurs/): pack a book. Lots of downtime will be available. Just be sure to remain vigilant while at the entrance or exit posts.
- Be especially kind to wedding-going guests. They are probably having a stressful day.
- Remember to thank guests who return "Have a good day"
- On weekends, pack a lunch. The time to exit the crowded parking lot, grab a lunch, and then exit is too great.
- Storms don't seem to stop guests from visiting. The only exception to this is the apocalyptic, green-skies variety of storms.
- During said storms, try to get either conservatory or exit post duty. They offer an amazing view of the storm from inside the glass.
- If someone on duty loses the rotation schedule, try to sort things out before someone gets stranded at a post.
- The Mother's Day crowd is the equivalent of that which would gather around the Clayton Chipotle if they happened to offer a day of free Mexican Food.
2015 Ms. Allison's May Project Advisees' Blog
Wednesday, May 20, 2015
Malcom Terrace Park
We quickly discovered
that the hauling of the mulch into the wheelbarrows followed by the pushing
over the wheelbarrows through the grass and the pouring of the mulch and
distributed evenly is quite tiring. So at first we were trying to do runs back
to back but that turned out to be inefficient due to the effect of going slow
because we were all tired so we quickly instituted a break in between runs. And
how we spent our breaks was fun for the majority of the project. Occasionally
we would just sit in the wheelbarrows and stay on our phones but most of the
time we would find a social and at least interesting way to pass out time.
On our third day
we discovered the playground on our brake time. There is a swing set and a
jungle gym. One day mark Clinton and I went to play on the swings and realized
that neither of us had been on a swing set since we were little boys at Forsyth
School together. We also both discovered that swings are really only made for
small children. The baby swings were incredibly uncomfortable but that had been
true when we were little too but surprisingly somehow the actual swings weren’t
wide enough for our bodies. So that was
uncomfortable but also the feeling of falling wasn’t fun like it was when we
little but instead it was more of a queasy unpleasant feeling. It made me
realize that we really aren’t kids anymore, which was a sad realization but
also all right because it’s a new stage in life. Obviously we aren’t kids
seeing as we are going off to college in a couple of months but in my mind I
really do still feel like a kid so I’m in an odd in between stage mentally even
though physically I am an adult.
Another adult
thing I learned from Malcolm terrace is how to balance a social life and
basically two jobs. I foolishly did not try to get hours off from the many
hours a week I spend working as a valet. I make a ton of money at my job but It
really does take up a lot of time and the may project took up an incredibly
large amount of time too. So I had to balance the time that I was required to
be at either of those “jobs” and then actually plan what to do with my free
time because I only had about three hours a day and I also had to run errands
so some of that time was even further truncated. But that was an important
lesson especially since I will be given the opportunity to plan whatever I want
in college so I am going to have to learn how to be efficient in my free time.
I was also able to
apply my knowledge of urban issues and design to the park to realize how the
park effects the surrounding environment negatively and positively and why we
did not see many people take advantage of the park during our many hours there.
The first thing that is wrong with the park is that it has no eyes on it from
the streets, or “eyes on the street” as we called it in urban. This is because trees
surround most of the park so it is secluded. This facilitates a sense of loneliness
and a lack of security. Therefore many people would choose not to visit the
park because they believe it isn’t safe even though it is a nice neighborhood.
Another issue with the park is that it doesn’t offer multiple ways to play. This
causes specialized play which is quite bad because specialized play only brings
a certain type of person to the park where as multiple different activities
offered in a park will lead to all different types of people from different
social and economic backgrounds. And as we said in urban this will to “brushing
shoulders” and becoming a more informed and active citizen. The other part of the park that is an issue
is “useless green space” which means that a large portion of the park is just
grass with nothing specific to do on it. While this looks like it could be a
good thing due to green making the park look nice it could be much better
because no one is using that space other than to look at it from a far. If it
were used to make a sports field or something of the sort that would get rid of
the specialized play issue that the park suffers from.
The park wasn’t all
bad from an urban standpoint though. One thing that the park has going for it
is that it is located right in a neighborhood and does not foster
auto-dependence. Many of the things we learned in urban always led to being bad
things if they caused people to use their cars more than they would if that
thing hadn’t been the case so anything that encourages people to walk is
terrific from an urban stand point such as the park.
One problem we had
at the park was the neighbors. Everyone we met had something to complain about
that was out of our control. But one day a woman came up top me while I was
working and started off by saying we were improving the park and that she
appreciated the work. So naturally I was excited that something I was doing was
helping. But then she asked me if at the end of the day I could clean up the
ramp that the city of Creve Coeur correspondence told us to create. I explained that we actually use the ramp
everyday so we needed to keep it to which she responded that was not alright
and it would end up killing the grass because the grass could not get an oxygen.
But we decided to do as we were told by the people in charge of our may project
and keep our ramp.
I also took Ap
environmental science this year and was able to see some of the stuff I leaned in
real life application at the park. We learned quite a lot about water flow and
one of the reasons we were mulching the path was because water had flowed
through in a way that had caused erosion and disrupted the beauty of the park. This
would also cause the path to become extremely muddy when the water flowed through
it, so it was killing two birds with one stone.
Upstream Outreach
As I said in my earlier post, I've been working on outreach for Upstream. I sent out the email to about 50 people, and a handful have already responded. From there, I've been cataloguing their responses, and keeping track of who's responded in an excel spreadsheet. I've also started calling up various people. I know I'm kind of a stereotype of a "millennial" but I find it mildly terrifying to call people up on the phone, especially asking people I've never met for advice. However, the first few people I've contacted have been very nice, so I feel a little better. I honestly haven't had the opportunity to contact that many people, however. I've tried to contact Mr. Boehm about what exactly I should ask, but he's been very busy as of late, so I feel a little uncomfortable calling up a whole lot of people without knowing exactly what kind of information I'm supposed to gather. Since communication has been a little rough with my Upstream supervisors, I may have to work on some more hours later on in the week in order to finish the project. I'm going to probably continue to work for Upstream either way into the summer; I enjoy the work, and I want to make sure that the outreach surveying is brought to a satisfying conclusion.
Tuesday, May 19, 2015
Tuesday, May 19th
Today Blake and I resolved ourselves to finish the playhouse- we failed but we came pretty close. Yesterday we couldn't find a small stool, a lifesaver, or any flags. Our playhouse is beach themed and we really thought all of these elements would make for a really cool interior. Luckily I was able to finish the shopping this morning with Ms. Allison. Amazon truly does have its merits.
Blake finished taping the outside walls, but we realized when Ms. Allison came that taping was unnecessary and time-consuming. Unfortunately I had already begun to paint the blue stripes on the one side, so we just had to go the time consuming way for that one. In a mere 9 and a half hours we finished painting all the stripes on the exterior and I was able to get the first coat of blue paint on the inside for the sky portion of the mural. I confess that the time spent painting white paint over white primer felt like an exercise in futility- but I knew deep down it was necessary. My only concern at this point is what we'll do for the floor. I asked Mr. Connor if he had any wood stainer, but he said something along the lines of how he doesn't like to keep some chemical in his shop if he can help it. Hopefully the IT department can help us tomorrow. In the worst case scenario we can just paint the floor white. All that's left is to finish the mural, the blue framing, the red doors and windows, and the small details and we're all ship shape and ready to go!
Evil Prints Final Post/Playhouse Post 1
Friday, May 15
Today I came into the shop and swept the whole place. We then planned how we were going to frame a piece. We first cut the piece down to fit into the frame with 2 inch borders. I then was sent to the store to buy heavy wire hangers, linen tape, and a foam core board. we ended up using the foam core board as the back of the picture frame to hold the piece against the glass after we cut it to size. After we put the piece in the frame and put in the foam core, we stapled the frame loosely on the inside of the rame so that the staples held the foam core in place. We then cut butcher paper to the size of the frame and glued it t the back of the frame to keep dust out and to preserve the piece.
Later that day around 3:00 I came to the set design studio at Burroughs to work on the play house. I just had come from Home Depot with two paint brushes, two paint rollers, primer, and wood filler. When I got to the studio, Damie and I started to fill holes and dimples in the wood with wood filler and a putty knife. I was there until 6:00 and I left after helping Mr. Connor clean up the shop a bit and tear down the old set design.
Monday, May 18th
Today I came into the shop at 10:00am and Damie had just sanded. We then coated the whole house inside and out exterior primer. While that dried, we went to Home Depot and bought A turquoise paint, a navy, a yellow, a white, and a red exterior paint. We also bought spray primer to touch up corners. We then Headed to Michaels to buy accessories for the playhouse. The theme for the play house is a beach house, so we bought kinetic sand, a bottle wrapped in rope, a treasure chest, rope, and rope-style trim. We then headed to target to buy three pillows, 1 blue and two yellow square pillows, and then a beach towel to lay inside on the floor. When we came back, we proceeded to tape off edges so that we could paint the next day.
Monday, May 19th
Today I came in at 9:00. Damie and I painted the house all day and almost finished. We finished painting the outside, but the inside still needs the mural.
Today I came into the shop and swept the whole place. We then planned how we were going to frame a piece. We first cut the piece down to fit into the frame with 2 inch borders. I then was sent to the store to buy heavy wire hangers, linen tape, and a foam core board. we ended up using the foam core board as the back of the picture frame to hold the piece against the glass after we cut it to size. After we put the piece in the frame and put in the foam core, we stapled the frame loosely on the inside of the rame so that the staples held the foam core in place. We then cut butcher paper to the size of the frame and glued it t the back of the frame to keep dust out and to preserve the piece.
Later that day around 3:00 I came to the set design studio at Burroughs to work on the play house. I just had come from Home Depot with two paint brushes, two paint rollers, primer, and wood filler. When I got to the studio, Damie and I started to fill holes and dimples in the wood with wood filler and a putty knife. I was there until 6:00 and I left after helping Mr. Connor clean up the shop a bit and tear down the old set design.
Monday, May 18th
Today I came into the shop at 10:00am and Damie had just sanded. We then coated the whole house inside and out exterior primer. While that dried, we went to Home Depot and bought A turquoise paint, a navy, a yellow, a white, and a red exterior paint. We also bought spray primer to touch up corners. We then Headed to Michaels to buy accessories for the playhouse. The theme for the play house is a beach house, so we bought kinetic sand, a bottle wrapped in rope, a treasure chest, rope, and rope-style trim. We then headed to target to buy three pillows, 1 blue and two yellow square pillows, and then a beach towel to lay inside on the floor. When we came back, we proceeded to tape off edges so that we could paint the next day.
Monday, May 19th
Today I came in at 9:00. Damie and I painted the house all day and almost finished. We finished painting the outside, but the inside still needs the mural.
Extra Hour Makeup Painting Extravaganza
I
spent my last 3 hours working the Dami and Blake on the wooden children’s playhouse
they are painting for some sort of auction.
I originally had all my hours planned out , but due to rain I ended up
being cut 3 hours short from the Laumeier Art Fair gig. It was nice working with people I knew and
people my age for change. We only
managed to put a single coat of primer on the house in the 3 hours, but we used
an entire bucket of paint so it’s not like we were working slowly. Using brushes and rollers, we covered the
whole outside of the house with primer, and then the inside as well, excluding
the floor. The outside wasn’t too hard,
except from some the nooks and crannies in and around the doors and
windows. I think we could have used a
couple small brushes, but it worked out anyways. Some sophomore girl even stopped by to help
us, which was nice. The inside of the
house was the more difficult part. The three of us barely fit into the house,
and any paint dripped onto the ground cloth became a hazard, perhaps especially
for me since I decided to wear new pants instead of an older pair. (I think I’ve ruined these pants the primer
isn’t coming out.) The inside ceiling was
very tricky, and I managed to get a fair amount of paint on my head, which was
really fun to scrub out in the shower.
Once we were done painting the whole thing, we spent a good half our
just trying to scrub the thick paint off of our hands and to clean the brushes
quickly before they dried. Overall it was
pretty fun, and I was glad that Dami and Blake let me join in on their
project. I wish them luck in finishing
the job.
aSanfilippo - Laumeier Sculpture Park
The
bulk of my may project ours were taken out in a quick 3 day period at Laumeier
Sculpture Park. The first day I worked
there, on Friday the 8th, I was running a bit late since I had to go
from the Animal House to home, quickly eat and change, and then rush to the Art
Fair. That evening, I was helping out
with setting up chairs and tables for the wine tasting event that would happen
that evening. Since it had rained
earlier that day (it’s been like monsoon season these past few weeks) me and
another volunteer spent the whole time (about 2 hours, maybe 3) setting up
tables and chairs and then drying each and every one of them off with
rags. It was pretty boring, thoughtless
labor but after months of writing essays and studying for tests I can’t say I
can complain in any right mind. There
was also a stage right next to us where a band was setting up and rehearsing,
so that was pretty neat to see/hear.
The next
day, I was there at 9:30 to begin my shift.
I was working in the back of the art fair where there was children’s
arts and crafts station. I was there with
a bunch of other volunteers, most of whom were either A) old people who liked doing volunteer work or
B) teachers who were actually being paid to do this. We were helping the kids make sculptures out
of this foam material that some company had donated to the park. The kids could use pipe cleaners and
toothpicks to put the stuff together, and scissors to make different
shapes. It was a flashback to doing
weird arts and crafts things when I was kid.
The problem was that we had like 8 people working there, and no more
than 2 kids actually there at a time. It
was pouring rain all day so a lot of the time I just spent talking to the other
volunteers and we ended up making foam sculptures ourselves. When there were kids there though it was fun
and I helped some kid make a dragon which was really neat. I mostly just focused on resupplying the
table and picking up trash, since some of the teachers seemed to be better than
me and helping the kids. I’m not super
good with kids, I learned that day, but I think by the end of the day I was a
little bit better with kids. I think if
I had to teach children for a living I would adjust pretty quickly, it’s just
not something I usually have to do and I’ve really forgotten what it was like
to be that age, since I’m never around small kids. I was allowed to take a lunch and dinner
break and I just bought some stuff at one the stalls that were selling
food. On my walk to my meals I got to
gander at the art that people were selling, which was really cool. The huge event made me realize just how many artists
there must be that live like that, just travelling around to big events selling
their work, never becoming famous but making enough to have a stable
career. Finally, at 8:30, I finished my
shift for the day and tiredly drove home.
The second day at Laumeier was much
more fun. It was sunny and we were
swarmed with kids. I got to help a lot
of them find the parts they needed to make whatever animal or person or crazy
hat they wanted to make, and it was generally pretty fun. I only worked until 5pm this time, but the
day went fast too just because we were actually busy with work. Still, there was time to talk with the
volunteers. In the last hour a storm
started coming in so we packed up quickly and then I ran to my car just before
it started storming like crazy. It was a
fun day.
Subscribe to:
Posts (Atom)