Sunday, May 17, 2015

Painting, Inventorying and Stage Managing- 5/17

For most of this week, I've been doing some work for Ms. Allison. Most of this work has been painting what we lovingly call "the fallout shelter", which is an art storage room in the bottom of the new building that I swear could survive a nuclear apocalypse. Earlier on, we moved a bunch of paintings to this room out from the bottom of the basement of the Brauer building. I managed to only break the glass on one thing, so I suppose that's a win. (And Ms. Allison reassured me that it wasn't a big deal, which was nice). From there, in order to make sure that the shelving looks consistent, I've been painting it grey, which while not necessarily the most exciting job to have, has been pretty nice actually. It's pretty relaxing...., except when suddenly the lights go out. That happened yesterday, and I accidentally dropped the paint brush in the paint. Whoops. As of yesterday, the painting is almost done, I would say- some of  it could be a little cleaned up, I guess, but in general, it's looking pretty good. 

In terms of Upstream work, I've done some outreach work for Mr. Boehm and some more inventorying for Tony. In terms of outreach, I looked up a bunch of theatre and English teachers from local high schools, middle schools, college and universities, and made a master list with all of their emails, phone numbers, etc. I felt a little creepy googling all these people to find their information, but c'est la vie, I guess.  I also wrote a draft for a first contact email with the teachers and a list of questions to ask them over the phone at some point. I'm going to try to send out the email today and start making phone calls during this week. For the work with Tony, I went over to the Kranzberg and I helped him inventory some lighting equipment, and seating equipment (like platforms, rails, chair sets, etc.) on Friday. I'm super surprised by how many lights the company has- it's not a super large theatre, but there's a lot of lighting equipment. We brought everything up on a lift from the basement. I'm not going to lie, I was initially a little terrified by the lift. It's basically a giant hole in the theatre floor that opens up and wobbles down into the abyss below. Once I rode once or twice though, it was not as scary any more, since I was either sitting or wedged between carts of lights, and falling out didn't seem as much of a possibility. I stayed there for a few hours, testing the lights' lamps and tilt, and Tony and I talked about TV and college plans. I'm not sure if I'll be able to come in again for more inventorying, but I'd like to. 

Finally, I didn't mention this in my earlier post, but I have been stage managing the seventh and eighth grade play, Snow Angel. The shows were Friday and Saturday night, and I have to say, the kids were very impressive. They are such sweethearts in addition to being so talented, and they put on a great show this weekend. As stage manager, my job was basically to make sure that the all the technical elements happen at the right time and make sure the show runs smoothly. In addition, since we didn't have a sound board operator, I ran the sound cues as well. Schroedter Kinman ran the lights, so I gave him a heads-up when they should go and told him when to change them. In addition, Sydney Tischler and Julia Hotaling were working with the kids backstage, as Assistant Director and Assistant Stage Manager respectively. Julia also ran the flies for a set piece we had, so I tried to call that for her too, though almost all the times when the window was supposed to fly, there were also light and sound cues, so it was a little difficult to call in the moment. Still, it generally worked out fine, and she flew the window in and out at the right times. It is kind of a stressful job to keep on top of everything, and I fudged a few sound cues in the Friday show, but the Saturday show went very smoothly, with almost no technical mistakes. Yay! After the Saturday show, we had strike, where we took down the set and cleaned up after the show. As usual, the actors were super excited to use the power tools, and it managed to go pretty quickly, since our set was not super complicated and there were a lot of hands to help out. Overall, I had an awesome time working on this play, and the end result was AWESOME (to quote one of the characters', Clifford, catchphrase) and a lot of fun. I still have the final song from bows stuck in my head and I'm currently listening to it to try to get it out of my head. I hope a few of you had the opportunity to see it. 

1 comment:

  1. Thanks for that very impressive post, Vickie! You painted quite the picture of everything you're been doing. I'm exhausted just reading it! And of course thanks for the actual painting that you're done in the fallout shelter! It's such an improvement! I'm glad too that working on the 7th and 8th grade play was so rewarding. All of the productions at Burroughs are impressive because all of you are impressive. I now know firsthand (after Middletown) how much work all of you put into it. Your dedication, talent and grit are admirable! And the work for Upstream Theater sounds educational and so helpful for them! And one more thing- the breaking glass was not your fault- it was mine. And no biggee. I should have just pitched it in the first place. :)

    ReplyDelete