Wednesday, May 20, 2015

End of Project Note Compilation

So, I have finally reached the end of my month at the Missouri Butterfly House. It is a bittersweet sendoff into summer. I have very  much enjoyed my time working in guest services, and I believe I have become a better person because of it. Additionally, I have learned many things in my time here, such as:

- There are four types of tourists:
1. Those who genuinely want to learn more about the exhibit you are showing
2. Children of any of the other three archetypes, who are typically interested in what you have to say-- assuming you speak to them in a way they can relate to
3. Those who are just here to see the sights. These people look at the exhibits like they're rides at an amusement park.
4. Photographers. This is a rather common type of guest, but they stand out in that many of them are return visitors, some visiting multiple times a week.

In learning these patterns, I have also learned how to alter the way I interact with customers to better suit what they want to learn about. For instance: the interested guests like hearing various facts about the exhibits (e.g. We have ~2000 butterflies in the conservatory) and children like to hear about the various special characteristics and colors of butterflies.

This work has left me with a feeling of fulfillment and pride. I am glad that I completed my project, and am looking forward to complete more similar projects. In fact, I have renewed my volunteer status at the Butterfly House for the coming summer. I eagerly await this undertaking and the coming experience, service, and happiness that will accompany it.


To add the some of the rest of the notes I have taken along the way:
 - Tuesdays & Sundays are by far the best. Easier crowds and good rotational schedules.
 - Co-workers are great. Everyone is very interesting to talk with.
 - On slow days (tues/wed/thurs/): pack a book. Lots of downtime will be available. Just be sure to remain vigilant while at the entrance or exit posts.
 - Be especially kind to wedding-going guests. They are probably having a stressful day.
 - Remember to thank guests who return "Have a good day"
 - On weekends, pack a lunch. The time to exit the crowded parking lot, grab a lunch, and then exit is too great.
 - Storms don't seem to stop guests from visiting. The only exception to this is the apocalyptic, green-skies variety of storms.
- During said storms, try to get either conservatory or exit post duty. They offer an amazing view of the storm from inside the glass.
- If someone on duty loses the rotation schedule, try to sort things out before someone gets stranded at a post.
- The Mother's Day crowd is the equivalent of that which would gather around the Clayton Chipotle if they happened to offer a day of free Mexican Food.






Malcom Terrace Park

We quickly discovered that the hauling of the mulch into the wheelbarrows followed by the pushing over the wheelbarrows through the grass and the pouring of the mulch and distributed evenly is quite tiring. So at first we were trying to do runs back to back but that turned out to be inefficient due to the effect of going slow because we were all tired so we quickly instituted a break in between runs. And how we spent our breaks was fun for the majority of the project. Occasionally we would just sit in the wheelbarrows and stay on our phones but most of the time we would find a social and at least interesting way to pass out time.
On our third day we discovered the playground on our brake time. There is a swing set and a jungle gym. One day mark Clinton and I went to play on the swings and realized that neither of us had been on a swing set since we were little boys at Forsyth School together. We also both discovered that swings are really only made for small children. The baby swings were incredibly uncomfortable but that had been true when we were little too but surprisingly somehow the actual swings weren’t wide enough for our bodies.  So that was uncomfortable but also the feeling of falling wasn’t fun like it was when we little but instead it was more of a queasy unpleasant feeling. It made me realize that we really aren’t kids anymore, which was a sad realization but also all right because it’s a new stage in life. Obviously we aren’t kids seeing as we are going off to college in a couple of months but in my mind I really do still feel like a kid so I’m in an odd in between stage mentally even though physically I am an adult.
Another adult thing I learned from Malcolm terrace is how to balance a social life and basically two jobs. I foolishly did not try to get hours off from the many hours a week I spend working as a valet. I make a ton of money at my job but It really does take up a lot of time and the may project took up an incredibly large amount of time too. So I had to balance the time that I was required to be at either of those “jobs” and then actually plan what to do with my free time because I only had about three hours a day and I also had to run errands so some of that time was even further truncated. But that was an important lesson especially since I will be given the opportunity to plan whatever I want in college so I am going to have to learn how to be efficient in my free time.
I was also able to apply my knowledge of urban issues and design to the park to realize how the park effects the surrounding environment negatively and positively and why we did not see many people take advantage of the park during our many hours there. The first thing that is wrong with the park is that it has no eyes on it from the streets, or “eyes on the street” as we called it in urban. This is because trees surround most of the park so it is secluded. This facilitates a sense of loneliness and a lack of security. Therefore many people would choose not to visit the park because they believe it isn’t safe even though it is a nice neighborhood. Another issue with the park is that it doesn’t offer multiple ways to play. This causes specialized play which is quite bad because specialized play only brings a certain type of person to the park where as multiple different activities offered in a park will lead to all different types of people from different social and economic backgrounds. And as we said in urban this will to “brushing shoulders” and becoming a more informed and active citizen.  The other part of the park that is an issue is “useless green space” which means that a large portion of the park is just grass with nothing specific to do on it. While this looks like it could be a good thing due to green making the park look nice it could be much better because no one is using that space other than to look at it from a far. If it were used to make a sports field or something of the sort that would get rid of the specialized play issue that the park suffers from.
The park wasn’t all bad from an urban standpoint though. One thing that the park has going for it is that it is located right in a neighborhood and does not foster auto-dependence. Many of the things we learned in urban always led to being bad things if they caused people to use their cars more than they would if that thing hadn’t been the case so anything that encourages people to walk is terrific from an urban stand point such as the park.
One problem we had at the park was the neighbors. Everyone we met had something to complain about that was out of our control. But one day a woman came up top me while I was working and started off by saying we were improving the park and that she appreciated the work. So naturally I was excited that something I was doing was helping. But then she asked me if at the end of the day I could clean up the ramp that the city of Creve Coeur correspondence told us to create.  I explained that we actually use the ramp everyday so we needed to keep it to which she responded that was not alright and it would end up killing the grass because the grass could not get an oxygen. But we decided to do as we were told by the people in charge of our may project and keep our ramp.
I also took Ap environmental science this year and was able to see some of the stuff I leaned in real life application at the park. We learned quite a lot about water flow and one of the reasons we were mulching the path was because water had flowed through in a way that had caused erosion and disrupted the beauty of the park. This would also cause the path to become extremely muddy when the water flowed through it, so it was killing two birds with one stone. 

Upstream Outreach

As I said in my earlier post, I've been working on outreach for Upstream. I sent out the email to about 50 people, and a handful have already responded. From there, I've been cataloguing their responses, and keeping track of who's responded in an excel spreadsheet. I've also started calling up various people. I know I'm kind of a stereotype of a "millennial" but I find it mildly terrifying to call people up on the phone, especially asking people I've never met for advice. However, the first few people I've contacted have been very nice, so I feel a little better. I honestly haven't had the opportunity to contact that many people, however. I've tried to contact Mr. Boehm about what exactly I should ask, but he's been very busy as of late, so I feel a little uncomfortable calling up a whole lot of people without knowing exactly what kind of information I'm supposed to gather. Since communication has been a little rough with my Upstream supervisors, I may have to work on some more hours later on in the week in order to finish the project. I'm going to probably continue to work for Upstream either way into the summer; I enjoy the work, and I want to make sure that the outreach surveying is brought to a satisfying conclusion.

Tuesday, May 19, 2015


Tuesday, May 19th


Today Blake and I resolved ourselves to finish the playhouse- we failed but we came pretty close. Yesterday we couldn't find a small stool, a lifesaver, or any flags. Our playhouse is beach themed and we really thought all of these elements would make for a really cool interior. Luckily I was able to finish the shopping this morning with Ms. Allison. Amazon truly does have its merits.
Blake finished taping the outside walls, but we realized when Ms. Allison came that taping was unnecessary and time-consuming. Unfortunately I had already begun to paint the blue stripes on the one side, so we just had to go the time consuming way for that one. In a mere 9 and a half hours we finished painting all the stripes on the exterior and I was able to get the first coat of blue paint on the inside for the sky portion of the mural. I confess that the time spent painting white paint over white primer felt like an exercise in futility- but I knew deep down it was necessary. My only concern at this point is what we'll do for the floor. I asked Mr. Connor if he had any wood stainer, but he said something along the lines of how he doesn't like to keep some chemical in his shop if he can help it. Hopefully the IT department can help us tomorrow. In the worst case scenario we can just paint the floor white. All that's left is to finish the mural, the blue framing, the red doors and windows, and the small details and we're all ship shape and ready to go!

Evil Prints Final Post/Playhouse Post 1

Friday, May 15

     Today I came into the shop and swept the whole place. We then planned how we were going to frame a piece. We first cut the piece down to fit into the frame with 2 inch borders. I then was sent to the store to buy heavy wire hangers, linen tape, and a foam core board. we ended up using the foam core board as the back of the picture frame to hold the piece against the glass after we cut it to size. After we put the piece in the frame and put in the foam core, we stapled the frame loosely on the inside of the rame so that the staples held the foam core in place. We then cut butcher paper to the size of the frame and glued it t the back of the frame to keep dust out and to preserve the piece.
    
     Later that day around 3:00 I came to the set design studio at Burroughs to work on the play house. I just had come from Home Depot with two paint brushes, two paint rollers, primer, and wood filler. When I got to the studio, Damie and I started to fill holes and dimples in the wood with wood filler and a putty knife. I was there until 6:00 and I left after helping Mr. Connor clean up the shop a bit and tear down the old set design.

     Monday, May 18th

     Today I came into the shop at 10:00am and Damie had just sanded. We then coated the whole house inside and out exterior primer. While that dried, we went to Home Depot and bought A turquoise paint, a navy, a yellow, a white, and a red exterior paint. We also bought spray primer to touch up corners. We then Headed to Michaels to buy accessories for the playhouse. The theme for the play house is a beach house, so we bought kinetic sand, a bottle wrapped in rope, a treasure chest, rope, and rope-style trim. We then headed to target to buy three pillows, 1 blue and two yellow square pillows, and then a beach towel to lay inside on the floor. When we came back, we proceeded to tape off edges so that we could paint the next day.


Monday, May 19th

     Today I came in at 9:00. Damie and I painted the house all day and almost finished. We finished painting the outside, but the inside still needs the mural.



Extra Hour Makeup Painting Extravaganza

I spent my last 3 hours working the Dami and Blake on the wooden children’s playhouse they are painting for some sort of auction.  I originally had all my hours planned out , but due to rain I ended up being cut 3 hours short from the Laumeier Art Fair gig.  It was nice working with people I knew and people my age for change.  We only managed to put a single coat of primer on the house in the 3 hours, but we used an entire bucket of paint so it’s not like we were working slowly.  Using brushes and rollers, we covered the whole outside of the house with primer, and then the inside as well, excluding the floor.  The outside wasn’t too hard, except from some the nooks and crannies in and around the doors and windows.  I think we could have used a couple small brushes, but it worked out anyways.  Some sophomore girl even stopped by to help us, which was nice.  The inside of the house was the more difficult part. The three of us barely fit into the house, and any paint dripped onto the ground cloth became a hazard, perhaps especially for me since I decided to wear new pants instead of an older pair.  (I think I’ve ruined these pants the primer isn’t coming out.)  The inside ceiling was very tricky, and I managed to get a fair amount of paint on my head, which was really fun to scrub out in the shower.  Once we were done painting the whole thing, we spent a good half our just trying to scrub the thick paint off of our hands and to clean the brushes quickly before they dried.  Overall it was pretty fun, and I was glad that Dami and Blake let me join in on their project.  I wish them luck in finishing the job.  

aSanfilippo - Laumeier Sculpture Park

The bulk of my may project ours were taken out in a quick 3 day period at Laumeier Sculpture Park.  The first day I worked there, on Friday the 8th, I was running a bit late since I had to go from the Animal House to home, quickly eat and change, and then rush to the Art Fair.  That evening, I was helping out with setting up chairs and tables for the wine tasting event that would happen that evening.  Since it had rained earlier that day (it’s been like monsoon season these past few weeks) me and another volunteer spent the whole time (about 2 hours, maybe 3) setting up tables and chairs and then drying each and every one of them off with rags.  It was pretty boring, thoughtless labor but after months of writing essays and studying for tests I can’t say I can complain in any right mind.  There was also a stage right next to us where a band was setting up and rehearsing, so that was pretty neat to see/hear. 
The next day, I was there at 9:30 to begin my shift.  I was working in the back of the art fair where there was children’s arts and crafts station.  I was there with a bunch of other volunteers, most of whom were either A)  old people who liked doing volunteer work or B) teachers who were actually being paid to do this.  We were helping the kids make sculptures out of this foam material that some company had donated to the park.  The kids could use pipe cleaners and toothpicks to put the stuff together, and scissors to make different shapes.  It was a flashback to doing weird arts and crafts things when I was kid.  The problem was that we had like 8 people working there, and no more than 2 kids actually there at a time.  It was pouring rain all day so a lot of the time I just spent talking to the other volunteers and we ended up making foam sculptures ourselves.  When there were kids there though it was fun and I helped some kid make a dragon which was really neat.  I mostly just focused on resupplying the table and picking up trash, since some of the teachers seemed to be better than me and helping the kids.  I’m not super good with kids, I learned that day, but I think by the end of the day I was a little bit better with kids.  I think if I had to teach children for a living I would adjust pretty quickly, it’s just not something I usually have to do and I’ve really forgotten what it was like to be that age, since I’m never around small kids.  I was allowed to take a lunch and dinner break and I just bought some stuff at one the stalls that were selling food.  On my walk to my meals I got to gander at the art that people were selling, which was really cool.  The huge event made me realize just how many artists there must be that live like that, just travelling around to big events selling their work, never becoming famous but making enough to have a stable career.  Finally, at 8:30, I finished my shift for the day and tiredly drove home. 

            The second day at Laumeier was much more fun.  It was sunny and we were swarmed with kids.  I got to help a lot of them find the parts they needed to make whatever animal or person or crazy hat they wanted to make, and it was generally pretty fun.  I only worked until 5pm this time, but the day went fast too just because we were actually busy with work.  Still, there was time to talk with the volunteers.  In the last hour a storm started coming in so we packed up quickly and then I ran to my car just before it started storming like crazy.  It was a fun day.    

Animal House Last Day - May 14

Today was my last day at the Animal House L.  They had some other volunteers there so they actually just had me brushing/socializing the cats the whole time, which was awesome, though 4 hours of playing around with cats is a bit much.  It’s fun going in to the rooms with the cats, and seeing how each cat reacts to you.  Some cats just walk right up and started meowing and rubbing against you, and some will wait for you to come to them but still love being brushed just as much.  All of the other volunteers there are like 40+, except for a woman who came in today who was in college training to be vet.  She must have sneezed 1000 times before she finally bailed.  I sneezed at least once per day, but she had to be allergic or sensitive to dust or something, I literally have never seen someone sneeze so much and so frequently.  Back on topic, I think overall the Animal House was a really fun place to work at.  I got to help some cats and the work environment was friendly.  

Animal House Day 2 - May 8th

For my second day at the Animal House, which was Friday the 8th, I was tasked again with the litter boxes.  Other volunteers and people I believe were staff members were working that morning as well, so the work went by much quicker, and I ended up sweeping the floors after that.  Sweeping isn’t bad working, and it certainly beats litter box work, but it was also not easy.  I had to move around a lot of furniture to get the nooks and crannies, and the floor area was not small.  Once again though, the work was rewarding because at the end of the day I got to brush and socialize with the cats in their cages and that’s always fun. 

Animal House Day 1 - May 6th

On my first day at the animal house, I spent the majority of my 3 hours cleaning litter boxes.  They have about  200 cats, and as my manager Brandyn explained to me, cleaning is a lot of the work they have to do, and is important to keeping the cats healthy and the whole experience being friendly to adopters.  So, while it wasn’t pleasant work, it was still nice doing something meaningful and for a good cause.  For the last 30 minutes or so, they had me brushing the cats, which is a lot more fun than regular cleaning.  The cats are shedding this time of year and the building is just a warehouse basically and gets a bit warm, so I feel like I’m really helping the cats in a direct way.  The staff there was really friendly and helpful.        

Monday, May 18, 2015

Central Prints days 5 & 6

Tuesday and Thursday 5/12/15 and 5/14/15

This is my last week working at Central Prints!! :( On the bright side I got promoted to printing both of these days.

On Tuesday, I got to stamp some spiders and cats onto a poster with a web on it. One of Marie's clients is a school teacher, and she had her kids write stories about Anansi the Spider. The poster we were working on will be cut in certain ways that will allow it to fold into a book! The kids can also unfold it back into a poster if they want, it's super versatile and cool. Stamping was a little challenging; the stamp would hardly leave a distinct outline even though I forced my entire body weight on top of it. The wooden spoons helped a lot though. Basically you place the stamp facing upwards onto the poster and you take the wooden spoon and vigorously rub the stamp with it from above the poster. Then I got to use a kind of printer that uses pressure (shame on me, I forgot the name) to put ink on paper; it's the same kind that our school has down in the printmaking section. I printed little yellow spiders on all 60 something posters. It was a lot of fun. Then Marie taught me how to clean the ink off of the rollers and plates and that was rough, especially the rollers. Thank god for baby wipes though.

Hours: 9:30-4:30= 6hrs

On Thursday, a group of high schoolers came in like Burroughs did and made some prints! I was really awkward since I totally forgot how to conduct myself around other kids after a month of limited human interaction. After Marie's demonstration, the kids got to work. Kate, a coworker from Firecracker, was helping the students with printing so she didn't really need my help. Marie assigned me to work on the big press (yessssss) and I got to print red apples on cards for the rest of the morning.
The apples look so shiny.
I spent the remainder of my day sorting tiny type letters back to their homes. 
Hand for scale. They're so tiny!

HOurs: 9-6= 9hrs

Clowder house last week

Monday 5/11/15
I think today was the day I got locked in the garage with another fellow coworker. We were assigned to go to the back to pick up some cat food and litter, but the door locked behind us. We panicked but I realized I had my phone. I texted Jody for help but she probably didn't have her phone on her because she didn't respond for a while. I tried calling too but she didn't pick up either. Then we heard some noise down the hall and we thought it was Jody; turns out it was just the cats knocking something over. Eventually we heard a voice and we started banging on the door and calling for help before we were finally rescued from our narrow and dark crawl space. It was kind of cool.
Oh my god also I think I met my soul mate/cat today. His name is Dobby, from Harry Potter, and he gives human hugs. He does this thing where when you hold him like a baby, he'll try to brush your hair with his paws and it's actually amazing.

Hours: 4-9= 5hrs

Wednesday 5/13/15
Just cleaned a bunch today. The usual. Also Dobby waited for me at the door today..... It was adorable.
Also I got clawed for defending my own food. Cats aren't supposed to eat dumplings anyway. 
Hours: 4-9= 5hrs

Saturday 5/16/15
Today's my last day at Clowder House! I was literally so tired today; it hasn't stopped raining since morning. The cats were extremely tired too, I think the rain contributed. I spent most of my time folding laundry and vacuuming today, which are two of my favorite chores to do around here, sadly. The laundry was fresh from the dryer, so it was radiating with warmth. The cats really enjoyed cat-piling on the clean laundry as well. Also Ms. Lorencz was here today! We hung a bit between jobs and it was pretty cool. I think we're becoming good acquaintances so that's a personal achievement for me. I'm going to miss Dobby though. I think he's my soul mate.
Hours: 10:30-3:30= 5hrs

Tenth Life volunteering 4

5.16.2015

Saturday was my last day at Tenth Life. I worked more with their online database and was able to finish up part of it. It was good to be able to more or less finish that part, however, there were a few minor things I had wanted to get done as well (like upload pictures of the cats to their profiles) and I was only able to start on the second part of the database that needed to be updated. In this way, this volunteering experience was not as rewarding as my internship. However, I know that the work I did get done was very important (more important than the work I did at Space) and that it was something that would have been harder for them to get done on their own. Therefore, it was a good experience overall. Also, to add to what I mentioned earlier about my generally positive experiences with the other volunteers and staff, Megan decided to come in to the storefront just to say goodbye since she realized that that was my last day. That made my day and was a really nice way to end May ProjectJ.   

Also, here's a bonus picture of one of the 11 kittens that are currently running around the storefront, cause who doesn't love cute pictures of kittens? 

Sunday, May 17, 2015

Painting, Inventorying and Stage Managing- 5/17

For most of this week, I've been doing some work for Ms. Allison. Most of this work has been painting what we lovingly call "the fallout shelter", which is an art storage room in the bottom of the new building that I swear could survive a nuclear apocalypse. Earlier on, we moved a bunch of paintings to this room out from the bottom of the basement of the Brauer building. I managed to only break the glass on one thing, so I suppose that's a win. (And Ms. Allison reassured me that it wasn't a big deal, which was nice). From there, in order to make sure that the shelving looks consistent, I've been painting it grey, which while not necessarily the most exciting job to have, has been pretty nice actually. It's pretty relaxing...., except when suddenly the lights go out. That happened yesterday, and I accidentally dropped the paint brush in the paint. Whoops. As of yesterday, the painting is almost done, I would say- some of  it could be a little cleaned up, I guess, but in general, it's looking pretty good. 

In terms of Upstream work, I've done some outreach work for Mr. Boehm and some more inventorying for Tony. In terms of outreach, I looked up a bunch of theatre and English teachers from local high schools, middle schools, college and universities, and made a master list with all of their emails, phone numbers, etc. I felt a little creepy googling all these people to find their information, but c'est la vie, I guess.  I also wrote a draft for a first contact email with the teachers and a list of questions to ask them over the phone at some point. I'm going to try to send out the email today and start making phone calls during this week. For the work with Tony, I went over to the Kranzberg and I helped him inventory some lighting equipment, and seating equipment (like platforms, rails, chair sets, etc.) on Friday. I'm super surprised by how many lights the company has- it's not a super large theatre, but there's a lot of lighting equipment. We brought everything up on a lift from the basement. I'm not going to lie, I was initially a little terrified by the lift. It's basically a giant hole in the theatre floor that opens up and wobbles down into the abyss below. Once I rode once or twice though, it was not as scary any more, since I was either sitting or wedged between carts of lights, and falling out didn't seem as much of a possibility. I stayed there for a few hours, testing the lights' lamps and tilt, and Tony and I talked about TV and college plans. I'm not sure if I'll be able to come in again for more inventorying, but I'd like to. 

Finally, I didn't mention this in my earlier post, but I have been stage managing the seventh and eighth grade play, Snow Angel. The shows were Friday and Saturday night, and I have to say, the kids were very impressive. They are such sweethearts in addition to being so talented, and they put on a great show this weekend. As stage manager, my job was basically to make sure that the all the technical elements happen at the right time and make sure the show runs smoothly. In addition, since we didn't have a sound board operator, I ran the sound cues as well. Schroedter Kinman ran the lights, so I gave him a heads-up when they should go and told him when to change them. In addition, Sydney Tischler and Julia Hotaling were working with the kids backstage, as Assistant Director and Assistant Stage Manager respectively. Julia also ran the flies for a set piece we had, so I tried to call that for her too, though almost all the times when the window was supposed to fly, there were also light and sound cues, so it was a little difficult to call in the moment. Still, it generally worked out fine, and she flew the window in and out at the right times. It is kind of a stressful job to keep on top of everything, and I fudged a few sound cues in the Friday show, but the Saturday show went very smoothly, with almost no technical mistakes. Yay! After the Saturday show, we had strike, where we took down the set and cleaned up after the show. As usual, the actors were super excited to use the power tools, and it managed to go pretty quickly, since our set was not super complicated and there were a lot of hands to help out. Overall, I had an awesome time working on this play, and the end result was AWESOME (to quote one of the characters', Clifford, catchphrase) and a lot of fun. I still have the final song from bows stuck in my head and I'm currently listening to it to try to get it out of my head. I hope a few of you had the opportunity to see it. 

Friday, May 15, 2015

Space Internship 2

5.13.2015

This was my last day at Space. I had planned on going in on Friday as well but I stayed a few extra hours so I wouldn’t have to go in on Friday. I was able to finish up the project I was working on (putting some designs into Sketchup and then transferring it into layout so that it could be sent off to another party involved in the project.) It felt great to be able to start and complete an entire project that was both beneficial to the firm and to me. I learned a lot about the programs I used, the firm itself, and the general process of how these kinds of projects are developed. Although I know that there’s a lot more I could learn, I was still able to learn so much since I could get hands-on and experience it myself. It was also an important experience in that it helped me further my understanding of what I want my future career to be. And then the fact that I actually created something from scratch that will actually be used by Space is something that I did not expect to be able to do. Overall, it was a great experience.  

Thursday, May 14, 2015

Clowder house day 5

Saturday 5/9/15

I'm cleaning the backrooms again, I think this is where I'm usually stationed now. There's this one cat called Tug that loves to jump on my back when I'm working. 
Same old procedure... However you'd think I would get used to the stench of cat excrement by now but I really haven't. I think the difference is that they use organic cat litter here so it doesn't control the scent as much as the conventional cat litter. But hey at least it's sustainable. 

Hours: 10-4= 6hrs

Central Prints day 4

Thursday 5/7/15

I got to make some prints today!! Marie demonstrated how to lay out a print for the little press and I got to ink up the palette and make the thank you cards. This is the "YOU" part.
This was basically how I spent my morning. I spent the rest of my afternoon polishing a whole box load of wood blocks. The blocks are for filling up spacing in prints so that images or words can be centered or oriented in a certain way. The blocks were super dusty and my fingers would get really pruny after cleaning for a while. While I was cleaning the blocks, I would also intermittently check on the cards to see if they were dry enough to print on the other side. This ink took forever to dry. It didn't dry completely until about an hour before my shift ended, but at least I got to print again.

Hours: 9-6= 9 hrs

Clowder House day 4

Wednesday 5/6/15

I cleaned the back rooms again. It's really hard to stay focused and clean when so many cats want to cuddle you at once. I tried my best not to get distracted, but they would eventually wear me down after every twenty minutes or so. I think my favorite is a cat named Patches; she's like a pillow. Later, I got assigned to clean the walls in the feral cat room. I was given a bucket of yellowish cleanser solution and a sponge and was put to work. I got a hell of an upper body work out scrubbing the walls clean... The cats really like to pee on the walls. I honestly don't know where the urine streaks on the wall ended and where the yellow cleaning agent began. The whole thing took about an hour or so, but at least the walls looked a bit whiter than before. I'm not sure what's in the cleanser solution I was given but after all that scrubbing, my hands felt like it lost a layer of skin. It's probably the high pH concentration or something. Yay chemistry.


Hours: 4-9= 5hrs

Central Prints day 3

Tuesday 5/5/15

I sorted lead types again today, got super into it. It took me about 3 hours; in my defense the type was super tiny. I had lunch at La Mancha today, totally worth a try. They make some bomb quesadillas. I spent the remainder of my two hours helping Marie design some thank you posts. It was the old fashion film thing where if you spin it fast enough the images on both sides of the paper will blend into one. Neat stuff.

Hours: 9:30-4:30= 6hrs

Clowder house day 3

Monday 5/4/15

Just took my AP Environmental Science exam this morning. It was kind of rough...

I cleaned the ZD room again today, and I also cleaned the hallway. The cats must've partied real hard the night before; so many cats threw up and so many more decided to fling their poop in the opposite direction of their litter boxes. Also there were cats eating other cats' vomit and I threw up a little in my mouth while I was cleaning it. The level of nastiness encountered today was unprecedented. Good thing I have no photographic record of this...

Hours: 4-9= 5hrs

Clowder House day 2

Saturday 5/1/15

I got to work in one of the back rooms today. So. Many. Cats. Oh and I saw Ms. Lorencz! She works here every Saturday so I'll get to harass her on a weekly basis now. I think vacuuming is starting to become a hobby, which is really sad. Vacuuming the room took about half an hour because there was so much fur and litter every where. It's also kind of cute when the cats scatter when I come close with the vacuum. There are some cats that like to bat at the head of the vacuum, which is adorable but a little bit obstructive.
Bambi


Yoshi

Patches



Noname (It's pronounced no-nah-may)

Lorencz in her natural habitat
Hours: 10-4= 6hrs

Central Prints day 2

Thursday 4/30/15

My second day at Central Prints entailed using the labeling gun. It's an ancient little tool with a letter dial and it's the coolest thing ever. I got to label everything: drawers, shelves, boxes, etc. I even thought about labeling myself (I didn't). Today was also the day that JBS art students took a field trip to come and visit me! Well not really me, just the print shop. I got to watch them make their prints and it all looked amazing. The staff was very impressed with their printing.

Hours: 9-6= 9hrs

Clowder House day 1

Wednesday 4/29/15

Today was my first day working at Clowder House. Clowder House is essentially a cat retirement home which also takes in ferals and strays. Diane and Jody are my supervisors here and they are super nice. My first job is to clean the ZD house. I forget what ZD stands for but basically the cats in this room are allergic to fish so they get special cat food.

The procedure is simple:
1. Clean the litter boxes. Replace the gross ones with new litter.
2. Brush off the cat blankets and beds. Throw the dirty ones into the laundry.
3. Sweep the floors.
4. Replenish/replace the water and food bowls.
5. Vacuum.

Okay, maybe not that simple. I had a rough time getting used to the stench of cat excrement since the litter isn't scented. Also cat throw up is really gross.

Then I had to repeat this process for the FIV room (cats with feline aids). Vacuuming was really fun; it was really satisfying hearing the dirt and litter hit the pipes because they would make a crackling sound.




Hours: 4-9= 5hrs

Central Prints day 1

Today is my first day working at the Firecracker Press/Central Prints. Marie (director of Central Prints) will be my main advisor since Matty (director of Firecracker Press) is on paternal leave (congrats!!). My first task was to organize stationary materials: envelopes, paper and plaster bags, paper, and art supplies. I love organizing anything that's not my room, so that was a pretty soothing exercise. My next task was to distribute lead type. Basically I had to sort hundreds of tiny (or kind of big) lead letters into their designated spots in the drawer. I got really into the zone; I ended up sorting three drawers (yay). That took about 2 hours or something. My last task was replacing old tape on linoleum prints. Let's just say by the end of it I got really good at ripping tape.

Hours: 11-6= 7hrs

First post (super late...)

I finally found it! I'll start transferring my posts from my other blog as soon as I can.

Evil Prints week 2

     Currently I have worked at Evil Prints for 4 hours the first day and 3.5 hrs for every other day since I started may 4th. Today and yesterday the shop was closed, but on monday I finished checking all of the mailing labels on the flyers for the upcoming series to sort out changed addresses or changed areas of employment--a project I started on friday. Also on friday, JT and I took a ladder and tried to undo the signs from the roof and they didnt come off. We took the signs' measurements and then designed an EP logo on adobe illustrator software, which he tought me some pointers about. We then glued two pieces of sheet metal together to use as the sign. We havent put the design on yet.

May 11 Monday

     Today a new takash printing press was delivered to the shop. We unloaded the press and assembled it in the studio. It was quite heavy. I then took an exacto knife to one of the prints and cut a trim design around the edge using a stencil.

May 12 Tuesday

     Today Cam and I used the new press. We printed the newest "War Wiggler" linoleum cut through it. We also showed his nephew how to make prints. He was a cool kid! We first inked the lino cut and tested it by printing on newsprint and it took Cam about twenty tries to finally ink it enough. We then made a rig to drop the lino cut onto and also to line up the squares that it would be printed on. I spent a lot of time tearing 7.5" x 7.5" squares of paper to print the design on.

May 13-14
    Shop closed

Tenth Life volunteering 3

5.9.2015
This time at Tenth Life was a lot better. Megan was there when I got there and got me set up with the program right away. I worked on it basically all day with a few breaks to play with the 12 or so kittens that came in that day ☺. (I also brought food this time unlike the other times, so I wasn’t starving for a change.)  Also since it was Saturday, there were a lot more customers and volunteers there. I was working in the back room and the volunteers generally come in through the back door so I saw most of them as they came in. Almost all of them noticed that I was new and stopped to introduce themselves and say hi, so my experience was a lot more rewarding in that way too. Also since I was working in the back room and not in the basement, cats would come in every now and again and jump up on my lap which was fun—a good balance between my first two days. Overall, I felt a lot more productive and helpful.

Tenth Life volunteering 2

5.6.2015
Today (Wednesday) was my second day working at Tenth Life. Elizabeth was once again in charge since Megan was not scheduled to be in the office. And once again, she didn’t really give me any directions so I just ended up sitting on the couch with the cats for the majority of the time I was there. It was obviously nice to be able to relax, but at the same time I felt like I was just wasting time and that I should have been doing something more helpful or productive.  In the last hour that I was there though, Megan did end up coming in. When she found out that I was just sitting there, having been given nothing to do, she apologized profusely and immediately started getting me set up with the program that she originally had wanted me to work on (although I had to leave before I had a chance to really get started). Before I left, she made sure that she will be able to come to the storefront the next time I am sign up to volunteer. Hopefully I’ll be able to be more productive next time. 

Tenth Life volunteering

5.2.2015
Saturday was my first day working at Tenth Life. So far, the communication has been kind of a problem.  First, when I first met with the coordinator, they had told me that orientation was required for all volunteers, and that orientation took place once every month. I was counting on going to the April orientation since I couldn’t make it to the one in March. It was only until halfway through April that I realized I hadn’t heard anything from them about the orientation date, so I then emailed the volunteer coordinator. Only then did I learn that they would not be holding one that month. So then I had to email Megan back and ask if I could come in separately so that I could still start on time. That didn’t end up being a big inconvenience, but I still felt bad asking that of her so last minute. Anyways, when I went in for orientation Megan was really nice and accommodating and we decided that I could help put data about all of their previous and present cats into their new catalog program. She said that she would help show me what to do when I started volunteering, but that for now I should email the TLOC coordinators and tell them when I was interested I was interested in coming in. However, they never got back to me (and they actually still haven’t) so I ended up emailing Megan again. Since I wouldn’t end up having enough hours (TL only being open Wed-Sat doesn’t leave much room for flexibility) if I didn’t go in on Saturday, Megan said that she wouldn’t be there that day but that I could come in anyway and just do various off jobs. She also emailed the TLOC volunteer coordinators again explaining my situation and asking them to put me on the calendar. Again, I have yet to hear from them. So when I went in on Saturday I ended up spending 4.5 hours in the basement organizing all their stuff. Luckily, I really enjoy organizing and I was able to more or less overlook the fact that it was really cold and dark down there. Elizabeth, the woman who was in charge that day originally sent me down there to put together a few cat carriers in case of emergencies and mentioned something about how they kept intending to set aside a day to organize the basement. She didn’t seem to know much about me or why I was there. She then went back upstairs and even though I stayed down there long after I was done putting the carriers together, she didn’t come back down until about 4 hours later (which I do understand because they seemed busy from what I could hear and I wasn’t originally supposed to be her responsibility). I guess I could have gone back upstairs to ask her what she wanted me to do next but I was pretty sure she wouldn’t really know the answer and I didn’t want to be a burden, so I found an answer to it myself. Anyways, my experience so far hasn’t been the best, especially if you have a really tight schedule that doesn’t allow for making last-minute changes. Hopefully Wednesday is better. 

Space internship

5.8.2015
Friday was my first day working at Space Architecture and Design. Overall it was a pretty good day. Amanda, the woman I’m working with, gave me a tour of the office and introduced me to people. Everyone was really nice and laid-back, but it was obvious that interns are not common—people were kinda confused about who I was and why I was there. That was the only discomfort that I experienced. Other than that, I settled pretty easily into the job that I was assigned to (transferring some basic designs for one of their projects into a program called Sketchup). I wasn’t given a lot of direction and I was a little nervous about it at first since I haven’t used Sketchup a great deal, but Amanda made sure that I knew that the project wasn’t time sensitive so I could work at my own pace, and that I felt comfortable asking her any question that I might have. She also explained that one of my main jobs was just to get a feel for the environment and culture and to get a better understanding of what they do (especially since I won’t be there for that long), which I thought was a really good way of thinking about it. To do so, she suggested that I come to the monthly, office-wide briefing meeting which happens to fall on one of the days that I’m interning, so I’m looking forward to going to that. 

Wednesday, May 13, 2015

Over the past couple days as I have been working at the Animal House, I've had a pretty fun time doing various things.  They usually have me cleaning out litter boxes in the morning, and then brushing/playing with the cats in the afternoon (I work 10 to 2).  Today, I spent 2 and a half hours just cleaning out dirty carrier cages.  It was pretty boring but they had music playing so it wasn't bad work at all, though it was definitely a bit gross.   Going into the the large pins where they keep the cats is pretty fun.  I quickly shut the gate to keep any cats from escaping and then I am bombarded by cats brushing against me and trying to get my attention.  Some of the cats are a little be more independent than others and I end up having to introduce myself slowly in order to get them to let me brush them.  Over all I'm really enjoying working at the Animal House and interacting with the people and cats there.

Tuesday, May 12, 2015

Jacobs first post

One the first day of my may project we all met bright and early at the Malcom Terrace park with the correspondents from the city of Creve Coeur park clean up guys. They instructed us on our daily duties of getting the wheelbarrows and bringing them to the mulch pile. On the first day we were told to build a ramp out of the mulch over the curb in order to be able to manuver the heavy wheelbarrows full of mulch to where they needed to go. It was a very effective system and has stayed intact and helpful everyday, but there was some backlash with the ramp that I will get into later. So after building the ramp we were told to lay down mulch on the four foot wide trail through the park starting at where last years may project group stopped. On our first day it was slow moving and we barely made 10 feet of progress but on the second day we nearly doubled our yield from the previous day

First Impressions

May Project has begun and I have started my volunteer work for the Missouri Butterfly House. My official position title is "Guest Services", but I have come to realize that, as the new volunteer, I can be called to do a wide variety of tasks around the establishment. These jobs include, but are not limited to: washing folding chairs, setting up chairs for weddings, working the entrance and exit of the Tropical Conservatory, teaching children about insects and arachnids, keeping track of children at birthday parties, loading seed packets, and keeping the peace within the Tropical Conservatory. I never expected to encounter such an easily fluctuating job, but I enjoy it very much. Not only do I enjoy doing all of these odd jobs, but I also deeply appreciate the kind and friendly atmosphere amongst the staff. Overall, the experience has been amazing, and I look forward to completing more volunteer work.

Monday, May 11, 2015

Monday, May 11th

So, as of today, I have completed a bunch of inventorying for Upstream Theatre, where I'm working for May Project. My hours have been a little irregular to say the least, but I've been communicating with  Mr. Boehm, who runs the company, and Mr. Anselmo, who is the technical director and hopefully I'll get some more work soon. I met Tony Anselmo last Thursday, and he gave me a tour of the Kranzberg Theatre, where the company performs, which is in the same building as the Craft Alliance in Grand Center. Then we went over to the storage (which frankly was just half a garage), which housed the props and costumes, and Tony told me that I'd probably have the opportunity to inventory that, which personally I think would be pretty cool. I'm a huge fan of costumes; they can be so pretty and ornate.

For the last few days though, I've just been making spreadsheets for lighting inventory. I sorted out gobos late last week, which, for all you non-theatre people, is a cut-out you put in front of a light in order to create a specific shape for the light. That didn't really take very long, but what definitely did take very long was cataloguing the gels, both cut gels and sheets. Gels are also used for lighting; they change the color of the lights. What I wasn't aware of going into the gel sorting, though, was how many possible colors there are for lights. I honestly had no idea that so many shades of green and clear existed, seriously. I spent a good 10 minutes earlier today trying to tell whether two shades of blue were the same. Also, they had at least five different shades of clear, which perplexed me a bit, but I'm no lighting expert. Thankfully, though, most of the gels were labelled, so that didn't happen too too much. The sheets were a little easier: they're bigger and there are less of them, but the cut ones were a little more difficult, since they're smaller, less often labelled, and were less organized to begin with. Still, I listened to a little Beyonce while I worked and the inventorying was pretty relaxing, actually. So far, my project hasn't been super exciting, but I have been enjoying it.

Thursday, May 7, 2015



Tuesday, May 5th

I got to help at Wildwood Press again. Elisa left for Ireland so it was just Maryanne, Carly, and Amanda. They moved on to printing a different set of hands! No really new developments- I stopped cleaning the press and I've moved on to fanning the plates to dry them of water before they're printed on paper. Occasionally they have to "wash out" the plates if they're becoming too dirty and I got to help with that too. I get to wear these rubber gloves and rub this nasty-smelling substance called Dynamite onto the metal sheets. Then we rinse them with water and dry them and they're good to go! Maryanne always plays music so it's never quiet- also they all tell such fun stories. At the end of the day Maryanne let me roll one of the prints! Because my arms are a bit shorter I couldn't quite reach the length of the sheets, but it worked out...I think. Later she took me to dinner at Applebees and I got to hear all about her awesome family. :)

Wednesday, May 6th

I returned to Wildwood Press again and it was pretty much the same stuff as yesterday. I helped cut glassine paper which would be used to separate different prints and make it easier for transport. Maryanne put together a portfolio of the hands for easy transport to her studio at the City Museum. I saw a small statue of Arya Stark on the desk in the room and I thought nothing of it, but apparently THEY ALL WATCH GAME OF THRONES. It's so awesome. They didn't see all the leaked episodes though so I couldn't say anything for fear of ruining something. Amanda and Carly left so Maryanne and I stayed for a bit to finish some more prints. She brought kettle corn which basically sustained me for the day. We went to Applebees again. They have this wonderful 2 for $20 dollar deal which we did yesterday too. I learned that the red and blue works at the end of Haeratter Hall were donated by Maryanne to Burroughs! After dinner we went to the Ciry Museum to drop off the prints, but because it was so late and dark we did not stay long, but it was so cool! She has so much art in there and I saw the same prints of artists' signatures that are in the conference rooms on the walls of her studio and apparently she donated those too- she told me how they were made and everything.

Thursday, May 7th

Blake and I are having difficulty with our playhouse project. "The committee" keeps asking us to revise our design because our colors always remind them of something. I really hope we can finish this on time.
I met with Maryanne and Amanda at Fuzzy Tacos for lunch then we went back to Wildwood Press. They finished up the hands from yesterday. I mentioned yesterday to Maryanne about Starbucks' new S'mores frappacino and how they're having this frappacino event where you get half off if you buy between the hours of 1 and 5. I drove in my own car, when I got there Maryanne handed me a Venti-sized frappacino. :D I was really energized at the time but now I can't quite remember all the details. I helped clean everything- it was an extremely productive 2.5 hours.



Thursday, April 30th

I helped Ms. Maryanne Simmons at Wildwood Press on this day. It's so much fun!! Currently she and her assistant Amanda, and her assistant's assistant, Carly, are working on the "All Hands On Deck" project where they print these huge pairs of hands. I mostly cleaned the press with a towel for the first part of the day. I also got to meet Elisa, Maryanne's sponger, who told me she was about to leave on a trip to Ireland with her mother, so this would probably be the first and last time I got to meet her. She's super cool. These ladies are so much fun to listen to. They're all associated with Wash U in some way or another and this was helpful for me because it was right before college decisions were due. Later I would get to clean up the ink from the table between prints. Printmaking is a very methodical process I learned. There are specific things that need to happen for each print. In my specific capacity I would first use a baby wipe to dissolve and clean the ink, but then I would have to go back with a wet sponge because apparently bad stuff happens when the chemicals from the wipe interact with the other materials. I would also have to dry the table with a paper towel. For lunch Maryanne took Elisa and I to Sweet Tomato- that place is awesome.
We returned and continued to work for a bit then we called it a day. I got to help pin the work to the walls, and at the end I got to wash the bowls and rinse the sponges.


Tuesday, April 28th

I helped Art St. Louis de-install artwork on this day. My sponsor, Ms. Robin Hirsch, sent me a total of three reminder e-mails. In 2/3 she told me to come at 9:00 am sharp, but on the third one she sent the day before, it said come at 9:40. I tried to call to see if it was a typo or something, but she didn't pick up. I assumed she meant to say 8:40 and I figured it was better to be early than late, so I ended up sitting/waiting in the lobby of Des Peres Hospital for about an hour until Ms. Kathy Duffin, Ms. Hirsch's assistant, finally showed up. It was a rough start but she was a nice lady. Artists were supposed to come every 30 minutes, and together we would go to where their work was hanging in the hospital and take them down. However, the schedule was all screwed up and there were some times when there were 45 minutes between when artists showed up. I was in charge of taking down the name and title cards from the walls and collecting the putty-substance they used to stick them on the walls. Unfortunately we were so efficient that it only took maybe 5-10 minutes to get their work down and send them on their way. What's more is there were long waiting periods between artists, so there was a lot of waiting around in general. Ms. Duffin told me all about her job and current projects and it was, for the most part, a pleasant experience. The artwork really brightens up the place for all the old sick people. :)  It is unfortunate however that there's a period of two weeks between de-installation and installation of the next round of work. The hospital has a reasonably nice cafeteria and I bought a sandwich and tea and Ms. Duffin proceeded to tell me even more about her work. It got to the point where we had to wait for 1 hr for the next artist, so Ms. Duffin told me to take a nap or something because she wanted to do some work on her computer. I napped for maybe 10 minutes when luckily the artist came early (which she normally shouldn't do, but we were okay with it.) After her there was one artist left. We decided to de-install his work in anticipation of his arrival so we could get out of there. We were so lucky that he also came early, and I was finally able to leave after 5 hours. Next time I plan on bringing something to do.

May 4-7 Evil Prints

May 4th

     This was the first day of my may project at Tom Huck's Evil Prints Printshop on Washington Avenue. I came in and was immediately greeted by Cam, one of the crew members, who I then followed for the rest of the day. He taught me how to print on shirts with a screen print and we then printed 14 Evil Prints shirts with the "evil kaneival number one" on them. I added ink to the screens, pulled them, and dried them. The shirt design consisted of two different screens. I also met Ashley, another crew member.

May 5th
     I came In and worked with Cam again, who taught me how to clean screen prints with chemicals, how to blast them with the power washer, and how to coat them with emulsion in the darkness. We also did that in the dark. He showed me the dark box where screen prints with emulsion on them are stored. We then Exposed two of his designs that were on paper that we had covered in baby oil to ultraviolet light to transfer the design into the emulsion. We then printed four shirts, two for each of his designs. I also talked to Tom Huck for a while about what it takes to be successful as an artist and what art school was like for him/how it impacted him (it didn't help him, apparently).

May 6th
     I came into the shop at 10:50 and then was sent to buy return mailing address labels and regular mailing address labels at office Depot. Tom, Kim and Sam (other crew members) and I struggled to figure out how to print them onto the stickers properly and how to format them. We did that for two hours and then finally found an avery software program that instantly did it for us...I then took the mailing address labels and placed them on 125 letters. I then put fliers in ever letter and a sticker along with them.

May 7th
     Today I went back to the shop at 11:00 my usual starting time and swept the shop. I then went to the gas station to get tom 4 mountain dews. Today Tom was interviewed in front of his current work in progress about his experiences with the outlaw printmakers. The camera crew asked him about every outlaw and his experiences with them, starting with Bill Fick, one of his personal heroes who inspired him to start the outlaws. I worked on the computer to validate mailing addresses and see if the names and locations were up to date on all 125 letters.